- Home
- General Incinerators
- I8-10S General Incinerator
I8-10S General Incinerator
Contact us for more information
The i8-10S General Incinerator is one of our most compact and effective small incinerators with suitability for various waste types including general and agricultural.
Our versatile range of āSā model incinerators are designed to be multi-purpose. This particular model benefits from a top loading design and very simple operation process. Ideal as a stand-alone machine.
Overview
Custom designed to match budget, specification and performance.
The addition of a secondary chamber allows this model to operate without smoke, odours or harmful emissions.
Features
- Enhanced Coretex insulation
- Multi-zone temperature control
- Mobile options available
- CE2 Advanced control panel
- Dual primary chamber burners
Applications
- Camps
- Military Operations
- < 50 People Communities
- Industrial Waste < 200kg per day
- Remote Housing
Technical Specifictions
Operational Specifications
Combustion Chamber Volume (m3): 0.1m3
Burn Rate*: up to 10kg per hour
Average Fuel Consumption: 3 – 4 ltrs p/h
Operational Temperature: > > 850Ā°C
Gas Retention in Secondary Chamber: 2 secs
Temperature Monitoring: Yes
Average ash residue (%): 3%
Thermostatic Device: Yes
Physical Specifications
External Length (mm): 740mm
External Width (mm): 760mm
External Height (mm): 3280mm
Door Size (mm): 330 x 330
Shipping Weight: 500kg
For reference only, not to be used for installation purposes. * All burn rates are dependant on the calorific value of the waste being incinerate. Atmospheric conditions,fuel (gas/oil) quality, additonal accessories (autoloader, de-asher) can also have a major impact on actual burn rates.
Optional Extras
Configuration Choices
Hand-built in the UK
All our incinerators are hand-built in the UK by time-served welders and fabricators. Our award-winning design team are always on hand to offer their advice and technical know-how to ensure we get your project off the ground without delay.
We can also assist you in the preparation for your planning or permit application where required.