- Home
- Animal Incinerators
- I8-250A Agricultural Incinerator
I8-250A Agricultural Incinerator
Contact us for more information
The i8-250A is large enough to offer impressive burn rates and batch sizes, whilst still being small enough to fit in a 40ft container. This model is an ideal disposal solution for farms, shooting practices, slaughterhouses, abattoirs, veterinary practices or similar facilities with high quantities of animals. Very popular for animal waste and fallen stock.
Overview
The i8-200A features a top-loading design with a large opening for bulky agricultural waste items.
Like all our ‘A’ range models it features a secondary chamber with an afterburner for the re-burn of harmful emissions with a 2 second retention time.
Features
- Enhanced Coretex insulation
- Multi-zone temperature control
- Large loading door
- CE4 Advanced control panel
- Excellent liquid retention
Applications
- Poultry Farms
- Animal Waste Collection
- Veterinary Laboratories
- Animal Research Centers
- Slaughterhouse < 3000kg day
Technical Specifictions
Operational Specifications
Combustion Chamber Volume (m3): 2.4m3
Burn Rate*: up to 175kg per hour
Average Fuel Consumption: 25 – 30 ltrs p/h
Operational Temperature: > 850°C
Gas Retention in Secondary Chamber: 2 secs
Temperature Monitoring: Yes
Average ash residue (%): 3%
Thermostatic Device: Yes
Physical Specifications
External Length (mm): 3590mm
External Width (mm): 1390mm
External Height (mm): 4640mm
Door Size (mm): 2530 x 1060mm
Shipping Weight: 8000kg
For reference only, not to be used for installation purposes. * All burn rates are dependant on the calorific value of the waste being incinerate. Atmospheric conditions,fuel (gas/oil) quality, additonal accessories (autoloader, de-asher) can also have a major impact on actual burn rates.
Configuration Choices
Optional Extras
Hand-built in the UK
All our incinerators are hand-built in the UK by time-served welders and fabricators. Our award-winning design team are always on hand to offer their advice and technical know-how to ensure we get your project off the ground without delay.
We can also assist you in the preparation for your planning or permit application where required.