Advanced waste incineration solutions for mining operations. Engineered for the world's most challenging environments, our award-winning incinerators are designed and manufactured to ISO 9001 standards. Speak with our mining waste specialists to find out if on-site incineration is right for your operation.
Let us know about your waste type and volume and find out which incinerator is best for your mine.
Discuss this recommendation
Our mining waste specialists will help configure the right system for your site.
All products in our General Incinerator range are suitable for mining waste, with capacity from 20kg/h to 600+kg/h. Click any product for specifications and datasheet download.
Mining operations generate high volumes of hazardous, organic and general waste in extreme remote environments. On-site incineration eliminates costly waste transportation and ensures regulatory compliance.
| Product | Container | Trailer | Skid | Shelter | Auto Load | Scrubber | Pollution | Generator |
|---|---|---|---|---|---|---|---|---|
| i8-20G | ✔ | ✔ | ✔ | ✔ | ✘ | ✔ | ✘ | ✔ |
| i8-40G | ✔ | ✔ | ✔ | ✔ | ✘ | ✔ | ✘ | ✔ |
| i8-200G | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✘ | ✔ |
| i8-250G | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ | ✘ | ✔ |
| i8-500G | ✘ | ✘ | ✔ | ✔ | ✔ | ✔ | ✘ | ✔ |
| i8-700G | ✘ | ✘ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ |
| i8-1000G | ✘ | ✘ | ✔ | ✔ | ✔ | ✔ | ✔ | ✔ |
West Africa • i8-200G & i8-700G
High capacity containerised solutions for gold mining camps across Senegal, Burkina Faso and Cote D'Ivoire.
Greenland • Exploration Camp
Waste-to-energy incinerators for self-sufficient remote camps in extreme Arctic conditions.
Sub-Saharan Africa • Containerised
Mobile containerised units for 24/7 mining operations in remote sub-Saharan extraction zones.
Global • Multiple Systems
Tailored waste management for offshore and onshore extraction sites with strict regulatory compliance.
Speak with our mining waste specialists for a free, no-obligation consultation.
Book a Waste Consultation© 2026 Inciner8 Limited | inciner8.com
Southport, UK • ISO 9001 • Made in Britain • 170+ Countries
Book 30 minutes via Teams to discuss your waste challenges. No hard sells. If an incinerator isn't for you, we'll gladly point you in the right direction.
Discuss this product
Our mining waste specialists will help configure the right system.
Book 30 minutes via Teams to discuss your waste challenges. No hard sells. If an incinerator isn't right for you, we'll gladly point you in the right direction.
Answer two quick questions for a recommendation.